Technip USA, Inc., Houston, TX, 11/2011 to
present Senior Planner Offshore Division- Mad Dog2
Project Spar BP / Anadarko Heidelberg Spar- ·
Contract
EPC with BP to build a Spar (floater) for the Platform Mad Dog2 on the Gulf
of Mexico (600 US$ Million). Assist project management team in preparation of
all Project Controls reports including but not limited to scheduling updates
and analysis, progress reporting, change management and various reporting for
management. Provides analysis and reporting for special and/or specific
Planning and Scheduling issues. ·
Works
directly with the Project Manager and Project team members to identify and
resolve problems in the area of Planning and Scheduling. Interfaces with
project stakeholders. ·
Reviews
and ensures communication of project related information in a timely manner. ·
Implements
and maintains compliance of Technip’s quality requirements relative to
discipline responsibilities. ·
Provides
additional analysis and reporting to Corporate Management as well as external
clients as required. CB&I Lummus Engineering, 05/2011 02/11 to11/2011 Senior Scheduler Specialist II- Cartagena
Refinery Project Colombia-Houston TX. ·
Main
Unit planner and scheduler for Crude, Vacuum and Hydrocracker Process Units,
site preparation and common areas. (purchasing and subcontracts) Engineering,
Procurement and Construction, Overall responsibilities for those units, ·
Monthly
report for client and weekly internal. Project is 3.4 billion US$ and
29000000 Man-hours. using Primavera P6, engineering, procurement (level 5 E
and P and level 3 for C). Development level 4 construction. Support to
the preparation and issuing of monthly reports to project management. Weekly
and monthly meeting . Weekly and Monthly reporting.. CDI Engineering, 04/04/2011 to 04/29/2011 Senior Cost Controller Hershey Project ·
Lead
Cost Control consultant to develop a cost control system within a period of 4
weeks that will include: project code of accounts, budget baseline based on
the Estimate, Budget Control, Approved Changes, Expenditures, Commitments and
Forecast in excel software, to be managed for junior cost controller, for
Hershey Project activities scope was Engineering, Procurement and Construction
for a Chemical Plant Capital Project 82 million. The system managed Level 1,
2, 3, 4 to contractual package level . Fishbone Services (Valero Refinery Houston ),
01/24/2011 to 03/31/2011 Primavera P6 Scheduler for Valero Houston
Turnarounds- Unit Crude, ULSD and FCC ·
Turn
around project 40 days for Valero Houston refinery, scheduling activities
using P6 updating existing schedules, Adding works changes into the schedule
and deleting works out of scope, resources leveling, Interface the
information between cost department using TTMC cost system as integration
tool with SAP and Primavera, and planning department, reporting S-curves per
subcontractor, per WO, per WBS as required per management from P6. . Aker Solutions, 05/2008 08 to 01/31/2011 Principal Cost Subcontracts Controller ·
Cost
control system tool set up for the GLF project, PRISM cost control tool set
up for construction. ·
Prepare
the manpower load for construction. ·
Assist
in the preparation for cash flow of the whole project model working with the
Business Manager and team leaders of the partnership. ·
Cost
control of construction phase at the site for direct hire project $120
million. ·
Monitor,
trending and forecasting all construction costs including direct hire and
subcontract work, field purchases, construction indirect, construction
supervision and management costs, back charges preparation to subcontractors.
Cash flow monitoring, forecasting support to change management from
subcontractors. Cost reporting activities in the field, prepare basis of
forecasts, Prepare Contractual progress reports to invoice the client the
construction portion of $237.7 million lump sum contract. Prepare ledgers and
subcontracts progress curves. Assist construction management supervision of
subs during weekly progress meetings. Specials reports by Project Manager,
and attend project subcontractor’s weekly meetings. ·
Cash
flow monitoring, forecasting support to change management from
subcontractors. ·
Cost
reporting activities in the field, prepare basis of forecasts, prepare
contractual progress reports to invoice the client the construction portion
of $237.7 million lump sum contract and prepare ledgers and subcontracts
progress curves. ·
Assist
construction management supervision of subs during weekly progress meetings,
specials reports by Project Manager, and attend project subcontractors weekly
meetings. River Consulting (Subsidiary Kinder Morgan), 01/2006
06 to 04/2008 Senior Planner and Scheduler Multi project
environment ·
Initiate
the immigration process getting a H1-B visa with them. Project Control
Engineering Work Item Project Register, Planning and Control Primavera P6.0,
3.1 scheduling multi-projects ambient for engineering company 250
workers. ·
Project
planning and control for different capitals projects as gold mining project
$100 million, “LOS FILOS” Mexico, project controls of major subcontract
of engineering and support to CM at site, carbon and coke terminals for
refineries as SRT and Sincor and very many others Kinder Morgan Marine
terminals with materials handling as cement, crushed stone and energy plants,
cost estimates using Means Data Books. ·
Project
controls and estimating in a Multi project environment. ·
Support
to corporate planning of vice presidency to obtain the one- year look ahead
resources commitments and availability. Valero Aruba Refinery, 11/2002 02 to 12/2005 Cost Controller and Turnaround Planner and
scheduler ·
Cost
Controller, Material planning and scheduling for several turnaround and
emergency shutdowns (for about $60 million/year and 900,000
Mhrs/Year) of crude units, hydrogen units, hydrotreater units, delayed
coker units, flare systems, kerosene unit, sulphur units, package boilers,
turbo generators, desalination units and visbreaker/vacuum flasher unit. The
work consisted of major maintenance and repairs of equipment heat
exchangers, drums, towers, turbo generators, blowers, compressors,
safety valves, control valves, pumps, motors, metal structure, piping,
insulation, painting, electrical and instrumentation systems. Cost close up
books man-hours, crew rate analysis, committed cost, estimated cost, actual
costs, productivity analysis, schedule variance analysis, and performance
analysis. ·
Manage
7 people . Williams International Pigap II, 07/1997 97 to
09/2002 Manager of Planning and Control and
Administration of Projects ·
Manager
of Planning and Control and Administration of Projects: for the directDirect
supervision, of 15 people, during the peak of the project reporting to
Construction Manager. Pigap Plant II, 2.6 million man-hours in
construction, 8 GE/Nuevo Pig none frame 5 compressors to inject
gas at 10000 psig, 1.500.000.000 SCFD, including all the civil,
mechanical, electric works and Instrumentation associated. A dehydration
plant and filtration, approximately 6 kilometers of distribution piping
for injection to 4 macula’s and a total of 12 wells. Project:
Train F Expansion Project at the Medium Pressure Jusepin Plant.
(Approximately $1.4 million) Project: Train D El Furrial (approximately
$5 million) construction of expansion of a gas injection plant. One
centrifugal compressor and one reciprocating compressor to inject gas at
7,700 PSIG, increasing the volume 150,000,000 SCFD to a total
plant capacity of 600,000,000 SCFD, including all the civil, mechanical
and electric works.. ·
Manage
12 people. Aguas de Monagas, C.A. World Bank Model Financed
Project –Spanish- Venezuelan- American 06/1996 to 06/1997 World Bank Consultant to the Presidency of the
Company ·
Contributed
to obtain the credit for the Privatization of the "Aguas de
Monagas" Model of the World Bank. BOO(Built-Own-Operate).This model was
implemented thru FOCSAVEN Company (Spanish operator) that operated the Water
Privatization of the Service. Supervise the correct utilization of World bank
funds “Unidad Ejecutora Del Proyecto de Mejoras al Sistema de Agua Potable y
Saneamiento Urbano de Aguas de Monagas, C.A”. Estimated investment cost of
Project 40 millions of US$, financed totally for the World Bank. The project
consisted expansion of the water plant, upgrading of the water network for
Monagas State, Construction of new sewage system for disposal waters ·
Manage
2 people. . CVG Bauxilum (Alumina (1.7 million tons/yr.) and
Aluminum Plant) 05/1995 to 05/1996 General Engineering Operations Manager Supervisor
name: Vice-president of Operations of the Company ·
Engineering
Manager for a Program of 12 million $ annual projects to maintain and upgrade
the Aluminum and Alumina Plant .Manage 150 people and the Cost
Optimization for the company included relocation of personnel from
Engineering department to others departments reduction to 98 people, with the
Engineering improvement in cost and flow of personnel of plant assigned to that
unit. Duration for execution upgrading of projects eliminating some
bottleneck causes in the design and execution phase and reduction of indirect
cost. ·
Manage
150 people. . . Cryogenic Expansion (ACCRO II), Jose Plant,
01/1993 93 to 05/1995 Planning and Control Manager Consortium Dit Harris-
Technip- Inelectra ·
Planning
and Control Manager Reporting to the Project Director expansion of the Train
3 and 4 of Jose Plant, consisting of separators towers,
substation expansion, compressor and cooler installation, plant pipeline
installation. ·
Manage
5 people. CVG Interlumina, Puerto Ordaz Venezuela, 11/1987 87 to
12/1992 Planning and Control Manager Direct Hire Expansion
Project reporting to Project Director Consortium CVG- Alussiesse Engineering ·
Planing
and Control manager for the mega Project ( more than 5000000 mhrs)
Two-million ton per year expansion of Alumina refinery. reporting to the
Project Director .Project included the installation of new process tanks,
heat exchangers, cyclones, conveyor belt, traveling stacker/ reclaimed, barge
unloading facility, Materials handling facility with Grinding area. ·
Manage
25 people. CVG Venalum: Aluminum Plant, 05/1985 85 to
10/1987 Planner/Scheduler Marshall and Associates ·
Junior/
Senior Planner and Scheduler V Line of Venalum production planning and
scheduling. LAGOVEN, PDVSA, 03/1982 82 to 03/1885 Project Engineer Direct Hire ·
Project
Engineer different projects pipelines, fire protection systems, gas lines.
Project training DSMA Project Lummus Vepica. General Engineering Caracas
Mechanical Department. Started Project control department with
utilization of Artemis INARCONSULT / ELECTROCONSULT MILAN , NATIONAL
ELECTRICAL SYSTEM VENEZUELA (CADAFE), 03/1980 to 01/1882 Project Engineer Hydroelectric Power Plant Uribante
Caparo ·
Project
Engineer Hydroelectric Power plant Uribante- Caparo. Pipeline and Gates
system. Preparation of master schedule using Pert CPM techniques manual.
Specification for mechanical design Turbines. Post grade studies University of Michigan Ann
Arbor 09/1976 to 12/1979 ·
English
as second language at the English Institute of the UoM. BS Civil Engineering,
MSE Mechanical Engineering and MSE Civil Engineering. At the UoM Instituto Venezolano
Investigaciones Científicas (IVIC) former INTEVEP 06/1973 to 04/1976 ·
Assistant
Engineer of Mechanical Engineering Shop from IVIC. Teaching Experience: 1. -
Professor Planning and Control Course, Universidad Simon Bolívar –1992 2. -
Planning and Scheduling using Primavera, courses of 24 hrs in house teaching
for different companies , Hack mar Contractors, Custom Contractors, Independent
contractors. Aruba 2002-2004 3.
–Planning and Control using Primavera P6 private lessons 5 students–Sep 2012 Publications 1.
AACE “PROJECT CONTROL FOR CAPITAL PROJECTS IN VENEZUELA”, 2.
Different Company administrative manuals and trained project team members in
common "best practices.” Project Management "Best Practices"
Techniques, using primavera P3 and P6. References
: 1.-
Ransom. McKenzie - Valero Planning Superintendent- 1-32-628-5071
Ransom.McKenzie@valero.com 2.- Ron
Ingraham- Williams Group- Construction Manager –001-505-486-6695
qualitec@animas.net 3.-
Paolo Murgia- Engineering Manager River consulting . pmurgia@riverconsulting.com 504-837-5275 4.- Jody
Fernandez- KVR – Planner and Cost estimator- 001-281-832-3805 jody7147@yahoo.com Jody Fernandez ·
|
|||||||||
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
Italian |
Beginner |
|
|
Spanish |
Fluent |
|
|
|